News
Latest news
(4/9/2010)
ENDURANCE featured on National Geographic's Explorer Series
(3/24/2010)
ENDURANCE begins second season in Antarctica
(10/6/2009)
NASA Approves ENDURANCE Upgrade Funding
(6/5/2009)
ENDURANCE Antarctica Mission begins
(11/26/2008)
Zacaton mission 3 begins
(5/13/2007)
Zacaton mission 2 begins
(3/07/2007)
Zacaton mission 1 begins
(1/26/2007)
Stone Aerospace Hawaii
(1/12/2007)
Joint Venture with New Vistas International
(1/05/2007)
Stone Advocates Lunar Mining
(1/01/2007)
2008 J2 Expedition Training Agreement
(8/27/2006)
Stone Seminar at Google
(8/27/2006)
DEPTHX takes flight
(7/26/2006)
MK6 design contract signed
(12/9/2005)
Zacaton Drop Sonde Mission
(5/29/2005)
ARMADILLO WORKS – Austin HQ up and running
(2/01/2005)
Press Kit
About us
Products
Contact

 

 

Home | Contact

ENDURANCE: Antarctica 2009 Mission

West Lake Bonney, Taylor Valley, Antarctica
Reporting from East Lake Bonney Basecamp

November 10, 2009

This was a day off. Most people were up at 1:20pm, after having gone to bed around 3am after downloading all the data and cleaning up from the late mission of November 9. Most people wrote blog entries and sorted photos. Kristof and John Priscu collected "glacier berries" - small chunks of ice that had broken off Taylor glacier - and hauled them back to camp in a sled behind their ATV. This has been our main water source.


John Priscu collects fallen blocks of ice for our drinking water from Taylor glacier.

Today was also a whirlwind of helo activity here with carpenters coming in from McMurdo to work on basecamp improvements and PIs ("Put Ins") of empty wastewater barrels and removal of full ones. Items to be "retro'd" (returned to McMurdo) had to be loaded into cargo nets for sling loading beneath a helicopter. A typical load is seven 55 gallon drums or a similar number of loaded propane tanks. A total of four flights landed here today.


Kristof brings and empty wastewater barrel to the Jamesway hut. Everything from dish and washwater to urine goes into these barrels.


Emma Steger prepares a 7 barrel sling load of wastewater to "retro" to McMurdo.